HUAWEI SmartPS-250A-T0 | 3-phase 250A – 20022249-003

155,18

TAXES INC.

Three-phase smart meter up to 250A – 3x 250A current transformers included / Required for monitoring consumption and managing surplus energy (storage, zero injection)

THERE ARE VARIOUS MODELS, ALL OF WHICH ARE COMPATIBLE: YDS60-C24 / DTSU666-H / DTSU71 / DHSU1079-CT

- +
Disponible para la venta · Plazo de entrega según stock de la referencia
Product
Finance your purchase with Cetelem
Reference: 20022249-003 Category:

Details of the HUAWEI SmartPS-250A-T0 | 3-phase 250A – 20022249-003

Three-phase smart meter up to 250A – 3x 250A current transformers included / Required for monitoring consumption and managing surplus energy (storage, zero injection)

THERE ARE VARIOUS MODELS, ALL OF WHICH ARE COMPATIBLE: YDS60-C24 / DTSU666-H / DTSU71 / DHSU1079-CT

Technical specifications

Warranty (years) 2
MPN 20022249-003
IP protection IP20
Weight 1.5 kg
Dimensions (L×W×H cm) 10.0 × 7.2 × 6.55

Documentation

Weight and dimensions

Weight 1,5 kg
Dimensions 10.0 × 7.2 × 6.55 cm
Warranty (years)

2

MPN

20022249-003

IP protection

IP20

User feedback

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Delivery deadlines

At FVComponentes.com we have stock of the references with the highest turnover, however our catalogue is so wide and economical because we work with many of the references on request. This means that the usual delivery time of 2-4 working days can be extended to 1-2 weeks + subsequent shipment by us. Thanks to this, we can offer very competitive and attractive prices to our customers that are difficult to match. If you wish, you can write to us via the chat on the website, call us at 968 97 83 01 or write to us at comercial@fvcomponentes.com to check if we have stock or the delivery time of the component you wish to purchase before finalising your order.